Project Type
Wastewater Project
Project Owner
Qatar Steel Company
Project Location
Doha, Qatar
As a company operating in a water-scarce region, Qatar Steel aims to reduce water consumption to the best of its ability, for the benefit of operations, as well as of the community and environment. Qatar Steel uses water in the form of freshwater, seawater, and recycled water in its operations as a cooling agent.
Qatar Steel’s water management approach focuses on three objectives: Decrease Freshwater Consumption; Reduce Wastewater Discharge;Increase the Recycling Rate of Processed Water.
In line with the guidelines released by the Qatar Ministry of Municipality & Environment (MME), Qatar Steel aims to minimize the amount of waste water discharged to the sea. In 2017, a project for achieving a Near Zero Liquid Discharge (NZLD) system began, with the provision of a Zero Liquid Discharge (ZLD) system. Qatar Steel hired consultants to conduct a feasibility study for recycling process waste water from DR2 plant.
The treatment plant for NZLD is being created to recycle the wastewater generated from the DR2 plant, by treating this water to the desired quality and then pumping the treated effluent to the process water sump. The NZLD process aims to maximize wastewater recovery and achieve NZLD in the plant.
Complete fabrication and delivery of 1 x ∅10m tank diameter thickener made from CS