Project Type
Iron Ore Mine Clarifiers
Project Owner
LKAB
Project Location
Gallivare, Sweden
Work on the application for a new, comprehensive environmental permit for Malmberget has been ongoing since 2018 but is now entering a new, more intensive phase. The goal is to have an application submitted by the end of 2022.
The application includes a continued and expanded production in existing facilities, as well as a new apatite plant with associated operations, an expanded sand and clarification reservoir, a reserve landfill for waste rock and a landfill for lime waste and inert waste. In addition, an assessment is made of the environmental impact that HYBRIT’s planned operations within the framework of LKAB’s area will entail. ”The production itself can be handled within today’s industrial area. However, the restrictions on the disposal of side rocks and enrichment sand have become an increasing problem for us, which means that we cannot produce the quantities that would otherwise be possible under the current permit. So this is very important for us”, says Monika Sammelin, Area Manager in Malmberget. ”This permit is extremely important both in the short and long term. In the short term, it is a prerequisite for ensuring continued operations and to continue the improvements that have taken us to where we are today. In the longer term, it is necessary for the implementation of the business’ climate change and other planned initiatives for a more environmentally friendly production”, says Mårten Fäldner, Project Manager for the permit application.
Complete fabrication and delivery of 3 x ∅17.5m tank diameter thickeners made from 316L SS and CS